When we started the production of "Need My Skirts 2", we did not know
what would pass everything.

What as continuation of " Need My Skirts 1" with a LLWC and a SLC
was planned, became a marathon with 3 LLWC' s, a SLC and a LAC.

How could this happen?

On the first day of the production the LLWC breaks! Ramona falls down
to the sofa too hard and this was the end of day 1.

But this was not only the end of day 1, it was also the end of the
planned story to our movie. At the second day we started first with
one LLWC and changed to the second LLWC and a LAC a short time
later.

This set video shows in detail both production days. And we had much fun despite all difficulties.

Ramona had to learn walking with a LLWC + SLC. Then with two
LLWC' s and a LAC. This wasn't really simple, but Ramona made it
perfect.

Who saw the film " Need My Skirts 2", can now experience how the movie was made and what happend around the production.